top of page

Ken Morrison Life Science Research Building

University of Nebraska - Lincoln
Clark Enersen

H& S Plumbing and Heating provided all the mechanical construction on this new three-story research building. The project was a traditional bid project. The building houses research laboratories, lab support spaces and faculty office space. The building also contains a Biological Safety Level Three (BLS-3) suite for research in infectious diseases. A lower level mechanical room and penthouse were built to house the many mechanical systems in the building.

PROJECT SUMMARY
Mechanical Project Cost

$5.3 M

General Contractor

Sampson Construction

Architect

Clark Enersen

SYSTEMS INSTALLED
  • Central Station Air Handling Units

  • Energy Recovery Units

  • Variable Volume Terminal Units with Hot Water Reheat

  • Supply and Return Duct Systems

  • Central Exhaust Systems for Laboratory Fume Hoods and Biological Safety Cabinets

  • Specialized Lab Systems including

    • Lab air

    • Lab vacuum

    • Lab gas

    • Pure water systems

    • Industrial hot and cold water

  • Steam, Condensate, Chilled Water and Heating Hot Water Systems

  • Roof and Storm Drain Piping

  • Domestic Water Piping

  • Plumbing Fixtures and Equipment

  • Natural Gas Piping

  • Connections to existing campus Steam and Chilled Water

PROJECT GALLERY
bottom of page